Skip the page header
Logo of POWER CONSTRUCTION INSTALLATION 4 - SONG HONG JOINT STOCK COMPANY

Power construction contractor · Hà Nội

Power Construction Installation 4 Song Hong Joint Stock Company

Building transmission lines and substations, plus civil, industrial, infrastructure, irrigation and water works. Operating without interruption since 2013.

Vision

  • To be a dependable power construction contractor in northern Vietnam.
  • To be capable of taking on transmission line and substation works as a turnkey package.

Mission

  • Build to the approved design and hand over on schedule.
  • Keep every worker safe on site, without exception.

Core values

  • Safety: the first condition for every item of work.
  • To the drawing: signed off at each handover stage.
  • On schedule: crews moved between sites as the programme requires.

What the company can do

Each segment below appears as you scroll, summarising what the company delivers on site.

  1. Lines and substations

    Built 220KV substations and extended a 500KV substation.

  2. Six fields of work

    Power, industrial, civil, infrastructure, irrigation, water supply and drainage.

  3. Turnkey or single items

    We take on a whole project or just a few items within it.

Capabilities of POWER CONSTRUCTION 4 - SONG HONG.,JSC
  1. Main contractor or consortium

    We join projects as main contractor or as a consortium member.

  2. Site safety

    Safety measures and supervision follow procedure on every shift.

  3. One shared system

    Progress and materials run on one system that works without signal.

What we deliver

Each item below is inspected and handed over on its own, against the approved design. We take on a whole project turnkey, or just a few items within it.

Fields of work

We take on a project turnkey or item by item, joining as main contractor or as a consortium member.

  • Transmission lines and substations

    Constructing power transmission lines and substations, installing both primary and secondary equipment.

  • Industrial works

    Building workshops, factories and supporting facilities for production.

  • Civil works

    Building housing, office premises and other civil structures.

  • Infrastructure

    Internal roads, site levelling, fencing and technical infrastructure within the project boundary.

  • Irrigation works

    Building and upgrading irrigation works per the approved design.

  • Water supply and drainage

    Installing water supply, drainage and water treatment systems on site.

Track record

Projects built and handed over, in order of time. The scope runs from tower foundations, concrete structures and earthing systems through to substation equipment and supporting works inside the fence.

  1. December 2009 and January 2010

    Capacity upgrade at Chèm 220KV substation

    Power construction crew II carried out the capacity upgrade, working through the night.

  2. September 2014

    Tháp Chàm 220KV substation

    Equipment installation and work at height at Tháp Chàm 220KV substation.

  3. September 2015

    Sơn La 500KV substation extension

    Craning equipment into place during the Sơn La 500KV substation extension.

  4. February to June 2024

    Nam Định 1 – Phố Nối 220KV line

    Erecting an 83-metre tubular tower at Mỹ Hào, Hưng Yên and stringing conductors across spans 276-286.

  5. Recognised on site

    Commended by EVNNPT

    The General Director of the National Power Transmission Corporation presented a commendation to the company on the working site.

  6. 2026

    Site management fully digitised

    Progress and materials moved onto one shared system that keeps working without a signal.

How we contract

Company photos

Photographs of the company at work on its construction sites.

  • Cable trench work: ducts laid on concrete supports before backfilling
    Cable trench work: ducts laid on concrete supports before backfilling
  • Stringing conductors on the Nam Định 1 – Phố Nối 220KV line, June 2024
    Stringing conductors on the Nam Định 1 – Phố Nối 220KV line, June 2024
  • Erecting an 83-metre tubular tower at Mỹ Hào, Hưng Yên
    Erecting an 83-metre tubular tower at Mỹ Hào, Hưng Yên
  • A line tower foundation poured and waiting for tower erection
    A line tower foundation poured and waiting for tower erection
  • Rebar and formwork for a tower foundation at Bình Giang, Hải Dương
    Rebar and formwork for a tower foundation at Bình Giang, Hải Dương
  • Fitting insulator strings and primary equipment in a substation
    Fitting insulator strings and primary equipment in a substation
  • Working on a substation bay from scissor lifts
    Working on a substation bay from scissor lifts
  • Fitting cable terminations and connections at a substation
    Fitting cable terminations and connections at a substation
  • Sơn La 500KV substation extension — September 2015
    Sơn La 500KV substation extension — September 2015
  • Craning equipment at Sơn La 500KV substation — September 2015
    Craning equipment at Sơn La 500KV substation — September 2015
  • Tháp Chàm 220KV substation — September 2014
    Tháp Chàm 220KV substation — September 2014
  • Working at height at Tháp Chàm 220KV substation — September 2014
    Working at height at Tháp Chàm 220KV substation — September 2014
  • Night work on the Chèm 220KV capacity upgrade — 1 January 2010
    Night work on the Chèm 220KV capacity upgrade — 1 January 2010
  • Capacity upgrade at Chèm 220KV substation — December 2009
    Capacity upgrade at Chèm 220KV substation — December 2009
  • Erecting steel line towers across hilly terrain
    Erecting steel line towers across hilly terrain
  • Site gate carrying the crew safety notices
    Site gate carrying the crew safety notices
  • Ground-breaking for the Hà Đông – Phủ Lý 220KV line reconductoring project
    Ground-breaking for the Hà Đông – Phủ Lý 220KV line reconductoring project
  • Ground-breaking ceremony, Hà Đông – Phủ Lý 220KV line
    Ground-breaking ceremony, Hà Đông – Phủ Lý 220KV line
  • Visiting the crews working three shifts on the line
    Visiting the crews working three shifts on the line
  • Company leaders presenting gifts to a crew at a tower base
    Company leaders presenting gifts to a crew at a tower base
  • The EVNNPT General Director presenting a commendation to the company
    The EVNNPT General Director presenting a commendation to the company
  • Company head office in Đông Anh, Hà Nội
    Company head office in Đông Anh, Hà Nội
  • Staff at the company head office
    Staff at the company head office
  • Ceremony awarding the 30-year Party membership badge
    Ceremony awarding the 30-year Party membership badge
  • Presenting the 30-year Party membership badge to a staff member
    Presenting the 30-year Party membership badge to a staff member
  • Company staff outing
    Company staff outing
  • A company construction site
    A company construction site

Photo 1 / 27

Photo 1 of 27

Company details

Full name
CÔNG TY CỔ PHẦN XÂY LẮP ĐIỆN 4 - SÔNG HỒNG
English name
POWER CONSTRUCTION INSTALLATION 4 - SONG HONG JOINT STOCK COMPANY
Short name
POWER CONSTRUCTION 4 - SONG HONG.,JSC
Tax code
0106221111
Head office
Group 20, Lam Tien Village, Thu Lam Commune, Ha Noi City, Viet Nam
Company type
Joint stock company
Operating since
2 July 2013

Contact

Telephone

024 3883 2837

Head office address

Group 20, Lam Tien Village, Thu Lam Commune, Ha Noi City, Viet Nam

Directions to the office